Website
News25/Ratings5
News · 26 weeks54+117%
2025-10-262026-04-19
Mix2790d
- Other14(52%)
- SEC Filings12(44%)
- Leadership1(4%)
Latest news
25 items- PRThe U.S. Imports 95% of Its Uranium. One Nasdaq-Listed Newcomer is the Largest Conventional Deposit in the CountryIssued on behalf of Eagle Nuclear Energy Corp. Companies mentioned in this commentary include: Eagle Nuclear Energy Corp. (NASDAQ:NUCL), Cameco Corporation (NYSE:CCJ), Uranium Energy Corp. (NYSE:UEC), Energy Fuels Inc. (NYSE:UUUU), Denison Mines Corp. (NYSE:DNN). RENO, Nev., April 16, 2026 (GLOBE NEWSWIRE) -- Equity-Insider.com News Commentary — The math on American uranium indicate there is a meaningful supply-demand gap. The United States operates the world's largest fleet of nuclear reactors, burning through roughly 50 million pounds of uranium per year¹. Domestic production? About one million pounds expected in 2026¹. The difference — the other 98% — is imported, mostly from Kazakhst
- PRAmerica's Largest Conventional Uranium Deposit Just Broke Ground on a Production RoadmapIssued on behalf of Eagle Nuclear Energy Corp.As Spot Uranium Touched $101/lb and SMR Buildouts Accelerate, One Newly-Listed Nasdaq Developer Is Quietly Becoming a Domestic Supply-Chain AnchorUSANewsGroup.com News CommentaryNEW YORK, April 15, 2026 /CNW/ -- The most consequential shift in the U.S. nuclear story over the past 18 months hasn't been a single executive order, a single SMR contract, or a single utility's reactor restart. It's been the convergence of all of them. Uranium spot prices punched through $100/lb for the first time since 2007 in late January, hitting $101.41
- PRForemost Clean Energy Intersects High-Grade Unconformity Mineralization at Hatchet Lake South Project with 1.4m of 1.0% eU3O8 within 4.6m of 0.34% eU3O8VANCOUVER, British Columbia, April 15, 2026 (GLOBE NEWSWIRE) -- Foremost Clean Energy Ltd. (NASDAQ:FMST) (CSE:FAT) ("Foremost" or the "Company") is pleased to provide an update from its ongoing 2026 drill program at the Hatchet Lake South Uranium Project ("Hatchet Lake"), located in the eastern Athabasca Basin region of northern Saskatchewan (Figure 1). Drilling has intersected unconformity-related uranium mineralization in five drillholes, highlighted by 0.34% eU₃O₈ over 4.6 metres, including a high-grade interval of 1.0% eU₃O₈ over 1.4 metres. Three drill fences stepping out from discovery hole TF-25-16 (6.2 metres of 0.10% U₃O₈; see news release dated October 29, 2025) have expanded the
- PR47 Drill Holes. 27,000 Feet. One of the Largest Uranium Deposits in America. And an Integrated Nuclear Platform with Both the Fuel and Reactor technology.RENO, Nev., April 09, 2026 (GLOBE NEWSWIRE) -- Equity-Insider.com News Commentary — There is a reason the nuclear sector has generated triple-digit returns over the past year.[1] The world needs clean baseload power. AI data centers are consuming electricity at a rate that solar and wind cannot currently reliably supply. Governments are committing tens of billions to nuclear deployment. And the fuel that makes it all work — uranium — is in a structural supply deficit that is getting worse, not better.[2] The Global X Uranium ETF (URA) has returned approximately 120% over the past twelve months.[1] Oklo has returned 125% in a year on zero revenue.[3] NuScale Power has drawn significant tra
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECAmendment: SEC Form SCHEDULE 13G/A filed by Denison Mines CorpSCHEDULE 13G/A - DENISON MINES CORP. (0001063259) (Subject)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 40-F filed by Denison Mines Corp40-F - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- PRDenison Announces Filing of Annual Report on Form 40-FTORONTO, March 30, 2026 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX:DML) (NYSE:DNN) is pleased to announce that it has filed its 2025 Annual Report on Form 40-F with the U.S. Securities and Exchange Commission ("SEC"). Denison's Form 40-F includes its annual information form, management discussion and analysis, and audited financial statements for the year ended December 31, 2025. The Form 40-F will be available on Denison's website at www.denisonmines.com and on the SEC's website at www.sec.gov/edgar. View PDF versionDenison's annual information form has also been filed with Canadian regulatory authorities and will be available on Denison's website at www.denisonmines.co
- PRUtah's Forgotten Uranium Belt Is Getting a Second Look. Here's Why the Timing Matters.Issued on behalf of EagleOne Metals CorporationVANCOUVER, BC, March 23, 2026 /PRNewswire/ -- Equity-Insider.com — Thirty-five miles south of Hanksville, Utah, in the heart of some of the highest-grade historical uranium country in the American West, there's a 206-acre property that was drilled once in 2008, returned mineralized intercepts across six commodities, and then sat untouched for nearly two decades. It's not hard to understand why. Uranium spent most of the 2010s in the penalty box. Spot prices languished below $30 per pound. Nobody was acquiring uranium ground in Utah.
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- PRDenison Reports Financial and Operational Results for 2025 and Final Investment Decision to Construct the Phoenix ISR Uranium MineTORONTO, March 10, 2026 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX:DML) (NYSE:DNN) today filed its Audited Consolidated Financial Statements and Management's Discussion & Analysis ('MD&A') for the year ended December 31, 2025. Both documents will be available on the Company's website (at www.denisonmines.com), SEDAR+ (at www.sedarplus.ca) and EDGAR (at www.sec.gov/edgar). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated. View PDF versionDavid Cates, President and CEO of Denison commented, "Over the past twelve months, Denison continued to m
- PRSkyharbour JV Partner Denison Mines Commences Winter Drill Program at the Wheeler North Joint Venture in Northern SaskatchewanVancouver, BC, March 09, 2026 (GLOBE NEWSWIRE) -- Skyharbour Resources Ltd. (TSX-V:SYH) (OTCQX:SYHBF) (Frankfurt:SC1P) ("Skyharbour", "SYH" or the "Company") is pleased to announce that its joint venture partner, Denison Mines Corp. ("Denison") (TSX:DML) (NYSE:DNN), has commenced the 2026 winter exploration program at the newly formed Wheeler North Joint Venture, formerly part of the Russell Lake property in the eastern Athabasca Basin of northern Saskatchewan. This winter phase of work will consist of approximately 2,500 metres of diamond drilling at the Fox Lake Trail ("FLT") target and represents the first phase of a planned 7,500 metre drill campaign in 2026 across the high-priority
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- PRDenison Announces Final Investment Decision for the Phoenix In-Situ Recovery Uranium Mine and Plans to Start Construction in March 2026TORONTO, Feb. 24, 2026 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX:DML) (NYSE:DNN) is pleased to announce that its Board of Directors has made a Final Investment Decision ("FID") to proceed with the construction of the Phoenix In-Situ Recovery ("ISR") uranium mine ("Phoenix" or the "Project"), and that site preparation and construction activities for Phoenix are planned to commence in March 2026. PDF Version David Cates, President and CEO of Denison commented, "Making a Final Investment Decision and the upcoming initiation of construction activities at Phoenix mark the beginning of a new era in Denison's history and the Canadian uranium mining sector. Our teams have worked
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- PRDenison Receives Final Regulatory Approval to Construct the Phoenix ISR Uranium MineTORONTO, Feb. 19, 2026 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX:DML) (NYSE:DNN) is pleased to announce that the Canadian Nuclear Safety Commission ("CNSC") has released the decision of its administrative tribunal (the "Commission") approving the Environmental Assessment ("EA") and issuing the Licence to Prepare Site & Construct a Mine and Mill (the "Licence") for the Wheeler River Uranium Project ("Wheeler River"). With the EA having previously been approved by the Province of Saskatchewan, and other provincial approvals necessary to commence construction already received, federal approval of the EA and the issuance of the Licence represent the final regulatory approval
- SECSEC Form 6-K filed by Denison Mines Corp6-K - DENISON MINES CORP. (0001063259) (Filer)
- PRDenison Announces Award of Construction Management Contract to Wood Canada for the Phoenix Uranium MineTORONTO, Feb. 17, 2026 /CNW/ - Denison Mines Corp. ("Denison" or the "Company") (TSX:DML, NYSE:DNN) is pleased to announce that, following a competitive tender process, it has awarded Wood Canada Limited ("Wood"), a global leader in consulting and engineering, with the construction management contract (the "CM Contract") to oversee the building of the Phoenix in-situ recovery uranium mine ("Phoenix", or the "Project"). This is a key milestone for the Project and represents another crucial step towards the commencement of construction. PDF Version.David Cates, President & CEO of Denison, commented, "In anticipation of receiving our Federal permits to prepare the site and construct the Wheeler